Tuesday, May 18, 2010

the beat goes on....

still moving forward at a fast pace....I was there twice last week one day and noticed a big change in just the time between breakfast and the end of lunchtime.  crazy.

the HVAC guys have almost finished their installation.  there are pics of their work here.
the carpenter has also removed and finished the deck on the back of the house.  its now 12' x 8' and pretty tall off the ground.  We're liking it alot.  it also acts as a canopy for the car...almost a carport.  good deal.

the electrician has prepped for the electric inspection, which is due to happen in the next week.  there is a circuit-breaker panel now and more plugs and switches in the junction boxes.  just a few more touch ups and they will be set for inspection.

the plumbers have spent the last 2 weeks jackhammering through the thickest concrete known to man to dig up the 100 year old cast-iron sewer pipes.  now that they're replaced with PVC, they need to be inspected as well, and then they can cover it up with new concrete.

because of the basement being dug into a half-dozen trenches, some of the electric and HVAC work has been delayed, but once the floor is repaired down there, it will only take them a day to get caught up and have it inspection-ready.

7 weeks left [I think]
now the real work begins.